Al-Sultan, K. S., & Pulak, M. F. S. (2000). Optimum target values for two stages in series with 100% inspection. European Journal of Operational Research, 120, 181-189.
Bowling, S. R., Khasawneh, M. T., Kaewkuekool, S., & Cho, B. R. (2004). A markovian approach to determining optimum process target levels for a multi-stage serial production system. European Journal of Operational Research, 159, 636–650.
Chung, H. C., & Hui, K. S. (2009). The determination of optimum process mean and screening limits based on quality loss function. Expert Systems with Application, 39, 7332-7335.
Duffuaa, S. O., & Gaaly, A. E. (2012). A multi-objective mathematical optimization model for process targeting using %100 inspection policy. Journal of Applied Mathematical Modeling, 37, 1-8.
Duffuaa, S. O., & Gaaly, A. E. (2017). A multi-objective optimization model for process targeting with inspection errors using 100 % inspection. The International Journal of Advanced Manufacturing Technology, 88, 2679-2692.
Fallahnezhad, M. S., & Ahmadi, E. (2014). Optimal process adjustment with considering variable costs for uni-variate and multi-variate production process. International Journal of Engineering, 27, 561-572.
Fallahnezhad, M. S., & Hosseininasab, H. (2012). Absorbing markov chain models to determine optimum process target levels in production systems with dual correlated quality characteristics. Pakistan Journal of Statistics and Operation Researches, 8, 205-212.
Fallahnezhad, M. S., & Niaki, S. T. A. (2010). Absorbing markov chain models to determine optimum process target levels in production systems with rework and scrapping. Journal of Industrial Engineering, 4, 1-6.
Fallahnezhad, M. S., Niaki, S. T. A., & Shahin, E. (2013). A markov model to determine optimal equipment adjustment in multi-stage production systems with considering variable cost. Iranian Journal of Operation Research, 4, 146-160.
Jinshyang, R., Lingua, G., & Kwiei, T. (2000). Joint determination of process mean, production run size and material order quantity for a container-filling process. International Journal of Production Economics, 63, 303-317.
Lee, M. K., & Elsayed, E. A. (2002). Process and mean screening limits for filling process under two-stage screening procedure. European Journal of Operational Research, 138, 118-126.
Lee, M. K., Kwon, M. M., Hong, S. H., & Kim, Y. J. (2007). Determination of the optimum target value for a production process with multiple products. International Journal of Production Economics, 107, 173-178.
Mohammadi, M., Dantan, J. Y., Siadat, A., & Tavakkoli-Moghaddam, R. (2018). A bi-objective robust inspection planning model in a multi-stage serial production system. International Journal of Production Research, 56, 1432-1457.
Park, T., Kwon, H. M., Hong, S. H., & Lee, M. K. (2011). The optimum common process mean and screening limits for a production process with multiple products. Computers & Industrial Engineering, 60, 158-163.
Pillai, V. M., & Chandrasekharan, M. P. (2008). An absorbing markov chain model for production systems with rework and scrapping. Computers & Industrial Engineering, 55, 695-706.
Rasay, H., Fallahnezhad, M. S., & Zaremehrjerdi, Y. (2017). Application of multivariate control charts for condition based maintenance. International Journal of Engineering, 31, 597-604.
Rasay, H., Fallahnezhad, M. S., & Zaremehrjerdi, Y. (2018). Integration of the decisions associated with maintenance management and process control for a series production system. Iranian Journal of Management Studies, 11, 379-405.
Rezaei-Malek, M., Tavakkoli-Moghaddam, R., Siadat, A., & Dantan, J. Y. (2018). A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system. The International Journal of Advanced Manufacturing Technology, 96, 3633-3650.
Shokri, S. Z., & Walid, K. Z. (2011). Optimal means for continuous processes in series. European Journal of Operational Research, 210, 618-623.
Wang, Z., Wu, Q., & Chai, T. (2004). Optimal-setting control for complicated industrial process and its applications study. Journal of Engineering Practice, 12, 65-74.
Zinlong, L., & Enriuedel, C. (2006). Setup adjustment under unknown process parameters and fixed adjustment cost. Journal of Statistical Planning an Inference, 136, 1039 - 1060.