Ahıskalı, A., Akkan, T., & Bas, E. (2025). Evaluation of a New Approach in Water Quality Assessments Using the Modified VIKOR Method: A. Ahiskali et al. Environmental Modeling & Assessment, 30, 613-623.
Ahmadpour, M., Aghajan Nashtaei, R., & Khodadadi, M. (2025). A Model For Assessing the Financial Risk of Companies Using The Hybrid FUZZY-BWM Method. Journal of Investment Knowledge, 15, 525-556.
Alves, J. L., & Pereira, M. A. (2025). Enhancing clinical and non-clinical risk management: A case study using ELECTRE Tri-nC. Health Care Management Science, 28(4), 824-841.
Amoozad Mahdiraji, H., Arzaghi, S., Stauskis, G., & Zavadskas, E. K. (2018). A hybrid fuzzy BWM-COPRAS method for analyzing key factors of sustainable architecture. Sustainability, 10, 1626.
Asan, U. M. U. T., Soyer, A., & Bozdag, E. (2016). An Interval Type-2 Fuzzy Prioritization Approach to Project Risk Assessment. J. Multiple Valued Log. Soft Comput., 26, 541-577.
Awodi, N. J., Liu, Y. K., Ayo-Imoru, R. M., & Ayodeji, A. (2023). Fuzzy TOPSIS-based risk assessment model for effective nuclear decommissioning risk management. Progress in nuclear energy, 155, 104524.
Barzegari, M. J., & Mousavi, S. M. (2026). Mining Project Portfolio Selection Based on an Interval Type-2 Fuzzy Entropy-MARCOS Method under Uncertainty. Journal of Quality Engineering and Production Optimization, e5111.
Budayan, C., Dikmen, I., Talat Birgonul, M., & Ghaziani, A. (2018). A computerized method for delay risk assessment based on fuzzy set theory using MS Project™. KSCE Journal of Civil Engineering, 22, 2714-2725.
Cevik Onar, S., Oztaysi, B., & Kahraman, C. (2014). Strategic decision selection using hesitant fuzzy TOPSIS and interval type-2 fuzzy AHP: a case study. International Journal of Computational intelligence systems, 7, 1002-1021.
Chen, S. M., & Lee, L. W. (2010). Fuzzy multiple attributes group decision-making based on the interval type-2 TOPSIS method. Expert systems with applications, 37, 2790-2798.
Cusanno, A., Seidi, M., Yaghoubi, S., Garcia-Romeu, M. L., & Piccininni, A. (2026). Multi-criteria quality assessment of parts produced by single point incremental forming process: application of the ELECTRE method. The International Journal of Advanced Manufacturing Technology, 142, 1505-1523.
Debnath, J., & Biswas, A. (2017, July). Assessment of occupational risks in construction sites using interval type-2 fuzzy analytic hierarchy process. In Industry Interactive Innovations in Science, Engineering and Technology: Proceedings of the International Conference, I3SET 2016 (pp. 283-297). Singapore: Springer Singapore.
DeCorla-Souza, P., & Hossain, M. (2025). New Tool to Screen Financial Viability of Alternative Public–Private Partnership Structures for Delivery of Electric Vehicle-Charging Infrastructure. World Electric Vehicle Journal, 16, 30.
Demirel, H. C. (2022). Dealing with uncertainty in infrastructure public-private partnership projects (Doctoral dissertation, Delft University of Technology).
Dorfeshan, Y., Mousavi, S. M., & Vahdani, B. (2018). A multi-criteria analysis model under an interval type-2 fuzzy environment with an application to production project decision problems. Journal of Quality Engineering and Production Optimization, 3(1), 43-66.
Fattahi, R., & Khalilzadeh, M. (2018). Risk evaluation using a novel hybrid method based on FMEA, extended MULTIMOORA, and AHP methods under fuzzy environment. Safety science, 102, 290-300.
Fei, L., Liu, X., & Zhang, C. (2024). An evidential linguistic ELECTRE method for selection of emergency shelter sites. Artificial Intelligence Review, 57, 81.
Fernández, E., Figueira, J. R., Navarro, J., Solares, E., & Díaz, R. (2025). Integrating second-order effects in ELECTRE methods with an interval-based approach. Omega, 137, 103353.
Govindan, K., & Jepsen, M. B. (2016). Supplier risk assessment based on trapezoidal intuitionistic fuzzy numbers and ELECTRE TRI-C: a case illustration involving service suppliers. Journal of the Operational Research Society, 67, 339-376.
Gupta, H. (2018). Assessing organizations performance on the basis of GHRM practices using BWM and Fuzzy TOPSIS. Journal of environmental management, 226, 201-216.
Hakam, D. F., & Wasesa, M. (2025). Advancing towards Indonesia's net zero emission goals: An in-depth multi-criteria decision making (MCDM) analysis of ship-loader operations in maritime transportation using interval type-2 fuzzy AHP and TOPSIS methods. Energy Reports, 14, 552-565.
Jahangirzadeh, A., Mousavi, S. M., & Dorfeshan, Y. (2020). An extended grey relational analysis based on COPRAS method for sustainable supplier selection in project procurement problems. Journal of Quality Engineering and Production Optimization, 5(1), 103-118.
Kan, Z., Wei, Y., Zhao, T., & Cao, J. (2024). Risk evaluation of submarine pipelines in FMEA by combination of gray relation projection and VIKOR method. Ocean Engineering, 302, 117695.
Kaya, T., & Kahraman, C. (2011). An integrated fuzzy AHP–ELECTRE methodology for environmental impact assessment. Expert Systems with Applications, 38, 8553-8562.
Khan, R. U., Yin, J., Mustafa, F. S., & Wang, S. (2024). Seaport hazardous cargo loading and unloading risk assessment using interval type-2 fuzzy sets and Bayesian networks. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 10, 04023065.
Kokangül, A., Polat, U., & Dağsuyu, C. (2017). A new approximation for risk assessment using the AHP and Fine Kinney methodologies. Safety science, 91, 24-32.
Li, J., Wang, J. Q., & Hu, J. H. (2019). Multi-criteria decision-making method based on dominance degree and BWM with probabilistic hesitant fuzzy information. International journal of machine learning and cybernetics, 10, 1671-1685.
Li, T., Wu, W., Li, X., Li, Y., Gong, X., et al. (2025). A Hybrid Approach Combining Scenario Deduction and Type-2 Fuzzy Set-Based Bayesian Network for Failure Risk Assessment in Solar Tower Power Plants. Sustainability, 17, 4774.
Liu, J., & Wei, Q. (2018). Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS. Journal of cleaner production, 189, 211-222.
Liu, Y., Wang, Y., Guo, A., & Ding, N. (2025). Risk assessment in anti-money laundering: an integrated entropy-AHP-VIKOR model. Risk Management, 27, 23.
Mahmudah, R. S., Putri, D. I., Abdullah, A. G., Shafii, M. A., Hakim, D. L., & Setiadipura, T. (2024). Developing a Multi-Criteria Decision-Making model for nuclear power plant location selection using Fuzzy Analytic Hierarchy Process and Fuzzy VIKOR methods focused on socio-economic factors. Cleaner Engineering and Technology, 19, 100737.
Martin, D. M., & Smith, D. R. (2025). Comparing SMART and ELECTRE methods for multi-criteria decision analysis: A case study evaluating conservation strategies. Environmental and Sustainability Indicators, 27, 100764.
Masudin, I., Zuliana, P. E., Utama, D. M., & Restuputri, D. P. (2024). Assessment and risk mitigation on halal meat supply chain using fuzzy best-worst method (BWM) and risk mitigation number (RMN). Journal of Islamic Marketing, 15, 842-865.
Mendel, J. M. (2017). Uncertain rule-based fuzzy systems. Introduction and new directions, 684.
Mohaghar, A., Sahebi, I. G., & Arab, A. (2017). Appraisal of humanitarian supply chain risks using best-worst method. International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering, 11, 309-314.
Mutlu, M., Cetin, N. C., & Onder, S. (2024). A novel risk assessment approach for open-cast coal mines using hybrid MCDM models with interval type-2 fuzzy sets: a case study in Türkiye. Systems, 12, 267.
Naz, S., ul Hassan, M. M., Mehmood, A., Espitia, G. P., & Butt, S. A. (2024). Enhancing industrial robot selection through a hybrid novel approach: integrating CRITIC-VIKOR method with probabilistic uncertain linguistic q-rung orthopair fuzzy. Artificial Intelligence Review, 58, 59.
Nguyen, T., Hallo, L., & Gunawan, I. (2024). Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14, 74-91.
Peng, H. G., Shen, K. W., He, S. S., Zhang, H. Y., & Wang, J. Q. (2019). Investment risk evaluation for new energy resources: An integrated decision support model based on regret theory and ELECTRE III. Energy Conversion and Management, 183, 332-348.
Rezaei, J. (2016). Best-worst multi-criteria decision-making method: Some properties and a linear model. Omega, 64, 126-130.
Safari, H., Faraji, Z., & Majidian, S. (2016). Identifying and evaluating enterprise architecture risks using FMEA and fuzzy VIKOR. Journal of Intelligent Manufacturing, 27, 475-486.
Sarwar, M., Gulzar, W., & Ashraf, S. (2023). Improved risk assessment model based on rough integrated clouds and ELECTRE-II method: an application to intelligent manufacturing process. Granular Computing, 8, 1533-1560.
Seikh, M. R., & Dey, A. (2025). Triangular divergence-based VIKOR method applied in a q-Rung orthopair fuzzy setting for health insurance plan selection. Journal of fuzzy extension and applications, 6, 300-317.
Wang, L., Zhang, H. Y., Wang, J. Q., & Li, L. (2018). Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project. Applied Soft Computing, 64, 216-226.
Xu, D., Hu, L., Peng, Y., & Jiang, L. (2026). An extended VIKOR method based on multi-valued neutrosophic sets. International Journal of Fuzzy Systems, 28, 1001-1013.
Yu, X., Zhang, S., Liao, X., & Qi, X. (2018). ELECTRE methods in prioritized MCDM environment. Information Sciences, 424, 301-316.
Zadeh, L. A. (1965). Fuzzy sets. Information and control, 8, 338-353.
Zadeh, L. A. (1975). The concept of a linguistic variable and its application to approximate reasoning—I. Information sciences, 8, 199-249.
Zandi, A., & Roghanian, E. (2013). Extension of Fuzzy ELECTRE based on VIKOR method. Computers & Industrial Engineering, 66, 258-263.