Schmid, V., Doerner, K. F. & Laporte, G. (2013). “Rich routing problems arising in supply chain management”.European Journal of Operational Research , 228, 435-448.
Madronero, M. D., Peidro, D. & Mula, J. (2015). “A review of tactical optimization models for integrated production and transport routing planning decisions”. Computers & Industrial Engineering.
Farahani, P. Grunow, M. & Gunther, H.O. (2012). “Integrated production and distribution planning for perishable food products”.Flexible Service Manufacturing Journal , 24(1), 28-51.
Ullrich,C. A. (2013). “Integrated machine scheduling and vehicle routing with time windows”. European Journal of Operational
Research , 227 (1), 152–165.
Chang, Y. C. & Lee, C. Y. (2004). “Machine scheduling with job delivery coordination”. European Journal of Operational Research
., 158(2), 470–487.
Chen, Z. L. (2010). “Integrated production and outbound distribution scheduling: Review and extensions”.Operations Research, 58(1), 130–148.
Chen, H. K. Hsueh, C. F. & Chang, M. S. (2009). “Production scheduling and vehicle routing with time windows for perishable food products”. Computers & Operation Research, 36(7), 2311-2319.
Buer, M. G. V. Woodruff, D. L & Olson, R. T. (1999). “Solving the medium newspaper production/distribution problem”.
European Journal of Operational Research , 115(2), 237–253.
Wang, Q., Batta, R. & Szczerba, R. J. (2005). “Sequencing the processing of incoming mail to match an outbound truck delivery schedule”. Computers and Operations Research, 32(7), 1777-1791.
Devapriya, P. Ferrell. W. & Geismar. N. “Optimal fleet size of an integrated production and distribution scheduling problem for a perishable product”. Working Paper., Clemson University (2006).
Chandra, P., & Fisher, M. L. (1994). “Coordination of production and distribution planning”. European Journal of Operational
Research ., 72(3), 503–517.
Chen, Z. L. & Vairaktarakis, G. L. (2005). “Integrated scheduling of production and distribution operations”. Management Science, 51(4), 614–628.
Pundoor, G. & Chen, Z. L. (2005). “Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and total distribution cost”. Naval Research Logistics, 52(6), 571–589.
Chen, Z. L. Handbook of Quantitative Supply Chain Analysis: Modeling in the EBusiness Era. Kluwer Academic Publishers:
Norwell, MA, USA (2004).
Lee, C. Y. & Chen, Z. L. (2001). “Machine scheduling with transportation considerations”. Journal of Scheduling, 4(1), 3–24.
Zhong, W. Y. Dosa, G. & Tan, Z. Y. (2007). “On the machine scheduling problem with job delivery coordination”. European
Journal of Operational Research , 182(3), 1057–1072.
HajiaghaeiKeshteli, M. & Aminnayeri, M. (2014). “ Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm”, 25, 184-203.
SaidiMehrabad, M., DehnaviArani, S. Evazabadian, F. & Mahmoodian, V. (2015). “An ant colony algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs”, 86, 2-13.
Chen, H. k., Hsue, C. F. & Chang, M. S. (2009). “Production scheduling and vehicle routing with time windows for perishable food products”. Computers & Operation Research, 36(7) 2311-2319.
Liu, Z. Zhang. Y. & Li. M. (2014). “Integrated scheduling of ready-mixed concrete production and delivery”. Automation in
Construction, 48, 31-43.
Averbakh, I., & Xue, Z. (2010). ” On-line supply chain scheduling problems with Preemption”. European Journal of Operational
Research , 181(1), 500–504.
Zegordi, S. H., Abadi, I. N. K., & BeheshtiNia, M. A. (2007). ” A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain”. Computers & Industrial Engineering, 58(3), 373–381.
Cheng, B.Y., Joseph, Y. T., & Li, K.. (2015). “Integrated scheduling of production and distribution to minimize total cost using an improved ant colony optimization method”. Computers & Industrial Engineering, 83, 217-225.
Miller, C. E., Tucker, A. W. & Zemlin, R. A. (1960). “Integer programming formulations and traveling salesman problems”.
Journal of the ACM , 7, 326–329.
Kyparisis, G. J. & Koulamas, C. (2006). “Flexible flow shop scheduling with uniform parallel machines”. European Journal of
Operational Research, 168(3), 985–997.
Pinedo, M. L. “Scheduling: theory, algorithms, and systems”. Springer Science & Business Media (2012).
Garey, M.R. & Johnson, D.S. “Computer and Intractability”. W.H. Freeman and ‘Company, New York (1979).
Geismar,H.N., Laporte,G.L.L. & Sriskandarajah,C. (2008). The integrated production and transportation scheduling problem for a product with a short life span .Informs Journal on Computing, 20, 21-33.